pkgs/id crate split — step 4: extract id-groups (groups/membership/encryption) #4407

Open

Description

@dezren39

Crate split step 4 of 7 — from the merged design

Design: doc/2026-11-01T16-53-00Z_design_id_crate_split/2026-11-01T16-53-00Z_design_id_crate_split.md (merged as PR #3824, 2026-11-01). Tracking issue: #3447. Program: #3195 (build-time review; Drew's priority order — shipped-binary runtime performance first, build time second).

Scope (design, verbatim intent)

Design step 4: id-groups. Groups/membership/encryption extract; seam 5 (encryption's session leak) is cut, and seam 6's bridge file leaves for its future home in id-worlds.

Current state

Not started.

Dependency — do not start early

Step 3 (id-sync) merged. If this step's queue task is claimed before the dependency lands, park it with that reason.

Fuel canary (non-negotiable, every step): the FUEL_BUDGETS tables in pkgs/id/src/sandbox.rs must be byte-identical after this step; the fuel-tables diff is committed in the step PR. Any drift means behaviour changed and the step stops. Full verification protocol: design note §"Verification protocol".

Verification protocol (design, every step): one PR; main green throughout; the shipped binary is built by the same Nix derivations at every point (all three entry points: the sub-flake's id-web and id-lib, and default.nix); test count matches or exceeds the step-0 baseline with any delta named; cold check-build timing recorded on #3447 and #3195 with the laptop load noted. Heavy builds run under ~/tools/fleet-build-lock on the laptop (max 2 concurrent, CARGO_BUILD_JOBS = half the cores) — there is no load gate (Drew, 2026-11-02).

Acceptance criteria

  • The extraction lands as its own PR off current main, sequenced after its predecessor step (see Related).
  • The id facade re-exports the extracted crate so existing call sites compile unchanged in behavior.
  • CI green on the PR (workspace build + the id test suites), including the F11.10 production-line guard.
  • This issue closes with the merge; the next step's issue is unblocked in sequence.

Activity

  1. added
    kind/performancePerformance problem or optimization
    priority/highImportant and time-sensitive
    queue/queuedHas a queued task in the Supabase agent queue
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Nov 2, 2026
  2. dezren39 commented on Nov 2, 2026

    @dezren39
    MemberAuthor

    Pickup by repo queue worker lane C for task 6301 (crate split step 4 of #3447). Sequence revalidation at 2026-11-02T15:52Z: step 3 (#4406, extract id-sync) is still OPEN and no merged PR for it was found, so step 4 does not start early. Task 6301 parks until #4406 lands.

  3. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 2, 2026
  4. dezren39 commented on Nov 2, 2026

    @dezren39
    MemberAuthor

    Parked by repo queue worker lane C (task 6301): sequence gate not met at 2026-11-02T15:52Z — step 3 (#4406) still OPEN, not merged. Resume condition: #4406 closed/merged; then start the id-groups extraction per task 6301 (canary: FUEL_BUDGETS byte-identical; builds under ~/tools/fleet-build-lock per the packet's build policy).

  5. 76 remaining items

  6. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  7. added
    queue/claimedQueue worker lifecycle state
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/queuedHas a queued task in the Supabase agent queue
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    on Nov 4, 2026
  8. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  9. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: handed_off
    task: 6301
    worker: repo-worker-code (lane code-f)
    stage: handed_off
    summary: Task 6301 re-claimed by lane code-f; execution-lane assignment again returned assigned_lane=opencode (session_id null), so this lane hands off per the runbook. Standing resume condition from prior checkpoints: the step-4 sequence gate — step 3 (issue #4406) must close/merge before extraction work on #4407 starts.

  10. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  11. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

    • Agent: queue worker (repo-worker-code), lane code-e
    • Session / ID: task 6301
    • Found via: queue claim
    • Task: small_fix for issue pkgs/id crate split — step 4: extract id-groups (groups/membership/encryption) #4407 re-claimed by lane code-e and handed off again to the opencode execution lane; the laptop claimant launches the bound opencode session for task 6301
    • Expectation: claimant session drives task 6301 to its terminal state
    • Links: n/a
  12. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  13. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  14. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  15. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  16. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insexpediteImportant - do this very soon, before anything not expeditedkind/performancePerformance problem or optimizationmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/highImportant and time-sensitivequeue/claimedQueue worker lifecycle statesource/creatorFiled by the new-issue-creator jobstatus/in-progressQueue worker lifecycle statetask/triageQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle state