You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
id: write the Phase 13 plan: client shells and client capability providers #564
Write a Phase 13 plan after Phase 12, with F12.7 (ABI conformance), F12.14 (portals) and F12.12 (many worlds) as stepping stones, to hold D1-050..D1-056. The client-side and transport ideas from the platform reports have no plan to live in; Phase 12 stops short of them.
Source
RPT §15 'Placement'
RPT = doc/2026-10-18T18-40-00Z_report_platform_world_state/2026-10-18T18-40-00Z_report_platform_world_state.md, REF = doc/2026-10-18T00-00-00Z_reference_platform_state/2026-10-18T00-00-00Z_reference_platform_state.md. Both are uncommitted reports in the platform-world-apps-migration worktree.
Current status
Not started.ls .opencode/plans has phase-9, phase-11, phase-12 and the 2026-10-20 status only; git grep -i 'phase 13' origin/main finds nothing.
Acceptance criteria
.opencode/plans/phase-13-*.md is committed
It holds D1-050..D1-056 (SSH frame transport, SSH-over-iroh, native shells, client capabilities, multi-server topology) and names F12.7, F12.14 and F12.12 as stepping stones
Each task has an exit criterion in the Phase 11/12 style
Activity
docs(id): Phase 13 plan — client shells and capability providers