You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Follow-on design ticket from #5678 — its decomposition sketch names this as a separate design, and the parent's acceptance requires these tickets to be filed and linked. Filed in the 2026-11-04 gap pass (WS-F) so the design work exists and can be prioritised on its own merits; implementation timing is a separate decision, possibly months out.
What this design must settle
Plugins/APIs (Obsidian plugins, Notion API), embeds/transclusion, and scripting/automation for the knowledge layer.
Context from the parent
The parent is a design-to-make-designs: a competitor feature-matrix programme over the #2048 zettelkasten layer whose deliverable is one follow-on design per cluster and per importer, filed and linked on the parent. The parent issue carries the surrounding decisions this ticket must not re-decide; where this ticket's answer would change a parent decision, record that explicitly rather than silently forking it.
Decision record expected
Close this design with a recorded decision (on this issue or in a doc/ record linked from it): the chosen shape, the alternatives rejected and why, and the invariants implementation must hold. If the design splits further, file the splits and link them here rather than growing this issue.
Relations
Parent: #5678. Programme: epic #2056. Filed by WS-F (2026-11-04 ID design gap & expansion pass).
Expectation: claimant launches the bound opencode session for task 10246; if unbound by lease/park expiry, task 10246 returns to the queue. This is the second handoff of task 10246 today — if the claimant cannot bind it, blocking it would stop the cycle.
Issue #5843 remains OPEN; no matching PR was found. Parent issue #5678 is also OPEN. The scope is already separated correctly as the knowledge-layer extensibility design: plugins/APIs, embeds/transclusion, and scripting/automation. The issue's own decision record requires the chosen shape, rejected alternatives, and implementation invariants; any further split should be filed and linked here rather than expanding scope or silently changing a parent decision.
Ordering: complete the design decision on #5843 before implementation. Keep #5678's competitor-matrix and parent decisions authoritative; if this design would change one, record the conflict explicitly. No implementation blocker or superseding artifact was found. This triage creates no duplicate task: #5843 itself is the existing design follow-on, and implementation timing is explicitly a later decision.
🤖 Agent note · handed off
Agent: queue worker (repo-worker-code), lane aea12c82-c5af-4e5a-9b66-f8e360f87177
Activity
developing-today commentedon Nov 5, 2026
CODE-1526
developing-today commentedon Nov 5, 2026
🤖 Agent note · handed off
dezren39 commentedon Nov 5, 2026
🤖 Agent note · picked up
dezren39 commentedon Nov 5, 2026
Triage findings — current main 2801e36
Issue #5843 remains OPEN; no matching PR was found. Parent issue #5678 is also OPEN. The scope is already separated correctly as the knowledge-layer extensibility design: plugins/APIs, embeds/transclusion, and scripting/automation. The issue's own decision record requires the chosen shape, rejected alternatives, and implementation invariants; any further split should be filed and linked here rather than expanding scope or silently changing a parent decision.
Ordering: complete the design decision on #5843 before implementation. Keep #5678's competitor-matrix and parent decisions authoritative; if this design would change one, record the conflict explicitly. No implementation blocker or superseding artifact was found. This triage creates no duplicate task: #5843 itself is the existing design follow-on, and implementation timing is explicitly a later decision.
🤖 Agent note · handed off