You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
id: design: attachments & media cluster (from #5678) #5844
Follow-on design ticket from #5678 — its decomposition sketch names this as a separate design, and the parent's acceptance requires these tickets to be filed and linked. Filed in the 2026-11-04 gap pass (WS-F) so the design work exists and can be prioritised on its own merits; implementation timing is a separate decision, possibly months out.
What this design must settle
File handling, OCR/handwriting (OneNote/Evernote class), and PDF annotation for the knowledge layer.
Context from the parent
The parent is a design-to-make-designs: a competitor feature-matrix programme over the #2048 zettelkasten layer whose deliverable is one follow-on design per cluster and per importer, filed and linked on the parent. The parent issue carries the surrounding decisions this ticket must not re-decide; where this ticket's answer would change a parent decision, record that explicitly rather than silently forking it.
Decision record expected
Close this design with a recorded decision (on this issue or in a doc/ record linked from it): the chosen shape, the alternatives rejected and why, and the invariants implementation must hold. If the design splits further, file the splits and link them here rather than growing this issue.
Relations
Parent: #5678. Programme: epic #2056. Filed by WS-F (2026-11-04 ID design gap & expansion pass).
Expectation: Triage outcome: follow-on design decision ticket from issue id: design: Knowledge layer feature program — competitor feature matrix, import/export, read-authority #5678, not a small fix. It must settle attachments & media for the knowledge layer: file handling, OCR/handwriting, and PDF annotation — without re-deciding the parent programme's decisions. Expected close-out is a recorded decision (on this issue or a linked doc/ record); no code in this triage task.
Activity
developing-today commentedon Nov 5, 2026
CODE-1527
dezren39 commentedon Nov 5, 2026
🤖 Agent note · done