Skip to content

docs(id): Phase 13 plan/issues cite pre-split line numbers; F11.12 status inconsistent across plans #841

Closed

Description

@dezren39

Some references in the Phase 13 plan and its issues point at code that moved in the F11.10 split:

F11.12's status also disagrees between documents. The Phase 12 plan's sequencing lists it with done Phase 11 work, but .opencode/plans/2026-10-20_phase-11-status.md says Planned. The status tracker is right: there is no id world journal check/backup yet (see the comment on #227). F11.12 gates every new Phase 13 frame kind, so the inconsistency matters.

Fix: update the references to symbol names, which survive moves better than line numbers, and reconcile F11.12's status.

Acceptance criteria

Activity

  1. added
    kind/docsDocumentation improvement or addition
    source/humanFiled directly by a human
    priority/normalOrdinary priority (the default)
    effort/sSmall: expected under 2 hours of work
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 26, 2026
  2. dezren39 commented on Oct 26, 2026

    @dezren39
    MemberAuthor

    Intake review

    Still live (verified this run): no merged PR since updates the Phase 13 plan references or reconciles F11.12's status, and the staleness mechanism (bare line numbers into code that moved in the F11.10 split) is exactly the kind that recurs if fixed with new line numbers. Not closed. Acceptance criteria appended to the body this pass.

    Related: #789 (cites the stale world_caps.rs:55 and pkgs/id/src/world.rs references) and #227 (the F11.12 comment — no id world journal check/backup exists yet, which is why the status tracker is right and the Phase 12 sequencing is wrong).

    Notes / risks: priority/normal, effort/s — small docs diff, but F11.12 gates every new Phase 13 frame kind, so the status half matters more than the citation half. Fix by symbol name, not by updated line number, or this issue re-files itself at the next split.

    Suggested approach: one docs PR touching the Phase 13 plan, the Phase 12 plan sequencing, and #789's references: CATALOG in world_caps.rs, ClientFrame/ServerFrame in pkgs/id/src/world_session/types.rs, capability execution in pkgs/id/src/world/actor.rs, F11.12 = Planned everywhere.

    🤖 Fleet monitor intake enrichment — labels normalized, acceptance criteria appended, and meta/enriched applied this pass.

  3. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

    • Agent: repo-worker-code (openchamber scheduled lane)
    • Task: queue task 2268; revalidate citations, current status and ownership.
  4. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed on Nov 1, 2026
  5. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triage verdict: citations stale; status needs updated assessment

    • Agent: repo-worker-code (openchamber scheduled lane), task 2268
    • Evidence: At main b56ccda5c4904abbf24639871e9a829bb391f4ea, the Phase 13 plan lines 34, 50 and 59 still use pre-split paths/line references, and id: Phase 13 F13.7 client-side capability providers under the ceiling model #789 retains old references; current symbols are ClientFrame and ServerFrame in world_session/types.rs and CATALOG in world_caps.rs.
    • Status correction: Define rollback compatibility for world profile journal entries #227 was completed via id: bump journal header on first ExecutionProfile write (#227) #1353, which added an atomic journal header bump for ExecutionProfile; the original issue assertion that this remains wholly planned is stale. F11.12 also includes journal check/backup CLI; establish present status separately rather than simply mark the whole feature done or planned. Preserve dated snapshots as historical and distinguish journal compatibility from all transport frames.
    • Route: scoped docs follow-up; replace stale references by symbols and reconcile current status against code and merged history.
  6. 1 remaining item

  7. added
    queue/queuedHas a queued task in the Supabase agent queue
    and removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 1, 2026
  8. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triage done and follow-up queued

    • Agent: repo-worker-code (openchamber scheduled lane)
    • Task: 2268 completed; scoped follow-up queue task 4861 covers citation and status corrections. Issue remains open.
  9. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Nov 1, 2026
  10. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

  11. added a commit that references this issue on Nov 1, 2026
  12. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · done

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/sSmall: expected under 2 hours of workkind/docsDocumentation improvement or additionmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/humanFiled directly by a human

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions