id: validation — delivered Phase 11 items (claimed-done audit) #1078

Closed

Description

@dezren39

Validation task: delivered Phase 11 items

Drew (2026-10-26): make tasks to validate the delivered work and ensure the tests are thorough and pass.

Scope: the Phase 11 items currently claimed done — F11.1 relay kit (#249), F11.4 fast CI lane (#224), F11.5 injected clock (#808), F11.6 fuel metrics + budgets (#247), F11.10 large-module split (#808), F11.11 single client projection (#250/#256/#808), F11.13 typed error codes (#808), F11.14 cheaper Screen (#248), F11.17 view-trap resilience (#547). The Phase 11 status record (.opencode/plans/2026-10-20_phase-11-status.md) contradicts itself on several of these, and #841 tracks plan/status inconsistencies — this task establishes ground truth from the code and tests, not from the documents.

Work:

  1. For each item: find its exit criterion in .opencode/plans/phase-11-foundations.md, find the test(s) that check it, run them, and record pass/fail here.
  2. Run the fast lane and the full suite; record timings (F11.4's exit is a median PR feedback time — measure it, don't assume it).
  3. Add tests where a 'done' item has no test that would catch its regression.
  4. File a separate issue per failure/gap and link them here; note any corrections needed for docs(id): Phase 13 plan/issues cite pre-split line numbers; F11.12 status inconsistent across plans #841.

Exit: every claimed-done F11 item is either verified by a passing test or has its own tracked issue; results recorded here.

Coordination (2026-10-26 reprioritization, per Drew): every id roadmap item now has its own GitHub issue, and priority encodes the order: (1) the path to Phase 12 — now + priority/high; (2) Phase 12 itself — next; (3) Phase 13 and long-term ideas — priority/low. The dashboard mirrors this list (org Project "Developing Today" #4, Area id-train; Grist Program roadmap, Area id). If this item turns out to be blocked, wrong, or superseded, park or close it with a note rather than letting it stall the queue — dropping an issue is always allowed; silently stalling is not.

Acceptance criteria

Activity

  1. added
    kind/testTest coverage, test infrastructure, or test-only fixes
    source/humanFiled directly by a human
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    Contributor
  3. added
    priority/highImportant and time-sensitive
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    nowOrg Project gate: active priority — orchestrator adds to the board
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    on Oct 27, 2026
  4. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    Intake review

    Related: Phase 11 items: #249, #224, #808, #247, #250, #256, #248, #547 · plan/status inconsistencies: #841

    Notes: Validation/audit task, not a fix: ground truth comes from code and tests, since the Phase 11 status record contradicts itself. Nothing in the body suggests the work is already done — it was filed 2026-10-27 by Drew as part of the validation batch (#1075–#1078).

    Risks: Scope is wide (nine F11 items plus two suite runs); the F11.4 timing measurement needs CI history, not a single run.

    Suggested approach: Work item-by-item against the plan's exit criteria; record the per-item table on the issue as you go; file gap issues immediately rather than batching them at the end.

    Labels were already normalized by the filer (kind, source/human, status/needs-triage, priority, effort, app/id all present); this pass appended the acceptance criteria above and adds meta/enriched.

    🤖 Agent note · filed

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor run 2026-10-26 22:19 CDT
    • Found via: monitor reconciliation (intake enrichment, protocol §5)
    • Task: Intake review — verified still live (filed this evening as part of Drew's roadmap/validation batch; no merged PR or commit resolves it), appended acceptance criteria, posted this review.
    • Expectation: done when the acceptance criteria above are met (effort class as labelled by the filer).
  5. added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 27, 2026
  6. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    Sequencing (Drew's Phase 12 reprioritization, 2026-10-26): this audit is step 7 of the ordered Path-to-Phase-12 queue in #1235 — work it after #1077, before the next step. The full order, the tier rules, and the drop rule live in #1235. Reminder of this issue's contract: verify the phase against its plan, add missing tests until the suite is thorough, and file a separate issue for every gap found — the follow-ups join the tier-1 queue.

  7. 61 remaining items

  8. added
    queue/queuedHas a queued task in the Supabase agent queue
    and removed
    queue/claimedQueue worker lifecycle state
    on Oct 27, 2026
  9. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

    • Agent: fleet monitor (repo-fleet-monitor)
    • Session / ID: queue task 1259; monitor run 2026-10-27T15:05Z
    • Found via: monitor reconciliation (Duty 1 addendum — claim/label divergence auto-repair)
    • Task: Claim evaporated: task 1259's lease expired 2026-10-27T14:44Z and the task fell back to queued while this issue still carried claimed labels. Labels reset to the truth: queue/queued + status/needs-triage.
    • Expectation: ⚠️ Task 1259 is at its attempt cap (3/3, stage verified — slice 5 lib test rerun, then closeout) and cannot be claimed again until an operator raises its cap. Resume point is the task's checkpoint progress.
    • Links: queue task 1259 (repo-health-code-pilot, DEAD-IN-QUEUE — flagged for operator repair in the monitor summary)
  10. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Oct 27, 2026
  11. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), Lane C shift
    • Session / ID: queue task 1259 (resume — attempt 4; slices 1–4 complete, slice 5 in progress per checkpoint stage=verified)
    • Found via: queue claim
    • Task: Resume slice 5: coverage-gap pass over the nine delivered F11 items (F11.1, F11.4, F11.5, F11.6, F11.10, F11.11, F11.13, F11.14, F11.17) + closeout table, then complete the audit
    • Expectation: effort l overall; this slice done = closeout table posted with per-item verdicts, any gap filed as its own issue (app/id + priority/high + now), task completed
    • Links: prior findings: slice-4 comment 6440590696; regression filed as id(ci): F11.4 regression — fast-lane median PR feedback is 19m09s over the last ten runs (exit: under 15m) #1401
  12. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · done

    Slice 5 — coverage gaps + CLOSEOUT: the Phase 11 claimed-done audit is complete

    Fresh verification this slice on current main 95cd41f0 (GitHub API and laptop origin/main agree): all nine checking tests named in slices 2–3 are still present (git grep at origin/main), the F11.5 sleep count is unchanged at 9 tokio::time::sleep calls in pkgs/id/src/world/tests.rs, and slices 2–3 executed the named tests passing (slice 2 executed-test confirmation; slice 3 ✅ marks), backed by green push-to-main id runs (e.g. run 40492562723 on 452d69e6, success).

    Item Final verdict Checking test / enforcement Gap issue
    F11.1 Relay kit (#249) ✅ Verified test_vendored_kit_matches_the_design_doc_copy (relay_ops.rs) — drift test, executed ✅ slice 2 —
    F11.4 Fast CI lane (#224) ❌ Exit NOT met Measured, slice 4: median fast-lane PR feedback 19m09s over the last ten runs, all ten over the 15m exit #1401 (regression, priority/high + now)
    F11.5 Injected clock (#808) ⚠️ Partial Schedule tests on ManualClock, 19 passed in 0.06s (slice 2) — the <1s half verified; the literal "no sleep in world tests" half unmet: 9 polling sleeps remain (recounted this slice on fresh main) #1326
    F11.6 Fuel metrics + budgets (#247) ✅ Verified checked_in_examples_stay_within_fuel_budgets covers every checked-in guest example; measure_reports_fuel_per_call_kind_for_a_checked_in_module ✅ slice 3 —
    F11.10 Large-module split (#808) ✅ Verified today, ⚠️ unenforced Criterion holds on fresh main: largest production file cli.rs 2,200 prod lines, no src/ file over 2,500 (rescan this slice). But no test, lint, flake check, or CI job enforces the limit — slices 2 and 5 were manual one-off scans #1438 (filed this slice: add a production file-size check to the fast lane)
    F11.11 Single client projection (#250/#256) ✅ Verified the_session_serializes_events_only_through_the_projection + the_projection_redacts_chat_and_the_install_seed ✅ slice 3 —
    F11.13 Typed error codes (#808) ✅ Verified CapError structurally mandates a code; a_refused_schedule_carries_its_reason_on_the_wire executed ✅ slice 2 —
    F11.14 Cheaper Screen (#248) ✅ Verified territory_view_fits_the_default_fuel_with_every_seat_taken (full-house view ~16% of the 10M limit, exit ≤40%) + the F11.6 budget row ✅ slice 3 —
    F11.17 View-trap resilience (#547) ✅ Verified a_trapping_view_degrades_to_an_error_and_recovers_on_the_next_event + fuel_exhaustion_traps_instead_of_hanging ✅ slice 3 —

    Timings (acceptance item 2): recorded in slice 4 — fast lane median 19m09s over ten PR runs (run table in comment 6440590696); full lane (id-e2e-nightly) 1h57m / 2h44m / 2h37m on its three completed runs that day. The slice-5 lib-suite rerun planned by the previous attempt was superseded: per the CI-first rule the suite's evidence is the green CI runs above plus the slices 2–3 executed tests, not another local compile.

    #841 corrections (accumulated across the audit): F11.1, F11.6, F11.10, F11.11, F11.13, F11.14, F11.17 = verified-done. F11.5 = partial (#1326). F11.4 / #551's "done" no longer holds (#1401). The F11.6 headroom table's territory row (78.0%) is pre-#248 — current measured full-house baseline is ~16% (budget row 21%). The Phase 11 plan text still describes F11.6/F11.11 as "in progress" on branches that have since merged (#247, #250/#256, #543).

    Exit check: every claimed-done F11 item is either verified by a passing test (7), or has its own tracked issue (F11.4 → #1401, F11.5 → #1326, F11.10's enforcement gap → #1438). This audit is complete; closing this issue — the follow-ups live in their own issues, and the Path to Phase 12 (#1235, step 7) can be checked off on this evidence.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-inskind/testTest coverage, test infrastructure, or test-only fixesmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:done