Skip to content

mcpx: Phase 2 of #2333 — rate-limit register truth-up (retire both gap rows) and #1957 evidence #2334

Closed

Description

@dezren39

Phase 2 of design #2333 (origin #2192, split of #1957). Gated on Phase 1 (#2192). Design doc: files/designs/code-mcpx-upstream-question-rate-limits.md in the keep-the-four-repos-healthy goal workspace.

Scope

Truth-up the conformance register for the two rate-limit rows once Phase 1 (#2192) has landed, so the register stops describing a bound that now exists:

Acceptance criteria

Activity

  1. added
    task/triageQueue packet kind: verify, reproduce, and route this item
    status/blockedQueue or user escalation state
    priority/normalOrdinary priority (the default)
    queue/queuedHas a queued task in the Supabase agent queue
    app/mcpxPackage/app: mcpx (pkgs/ or apps/ in this repo)
    on Oct 29, 2026
  2. developing-today commented on Oct 29, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    Phase 2 of design #2333, filed today; sub-issue of #2333 (verified in its sub_issues list). Gated on Phase 1 (#2192, the adopted origin) — labelled status/blocked. Triage packet enqueued: pilot task 3489 (queue=repo-health-code-pilot, status=queued, attempts=0, verified); triage must confirm the #2192 gate before enqueueing any implementation follow-up. Decision is recorded on #2333.

  4. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Oct 30, 2026
  5. 5 remaining items

  6. added
    queue/queuedHas a queued task in the Supabase agent queue
    and removed
    work/assignedQueue worker lifecycle state
    on Oct 30, 2026
  7. dezren39 commented on Oct 30, 2026

    @dezren39
    MemberAuthor

    Agent note — verified triage already delivered, gate re-checked fresh (queue task 3489, Lane C shift)

    Re-claimed 3489 and revalidated: the triage verdict for #2334 was already posted by a Lane E pass 2026-10-30T11:59Z — gate NOT satisfied, scope confirmed, no follow-up enqueued. I re-checked the gate fresh just now: PR #2706 (Phase 1, #2192) is still OPEN, not merged, so the verdict stands unchanged and this issue correctly keeps status/blocked. Completing 3489 as triaged on that evidence; labels left as the earlier pass set them. When #2706 merges, #2334's Phase 2 becomes enqueueable.

  8. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

  9. added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    status/blockedQueue or user escalation state
    on Nov 1, 2026
  10. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · done

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

app/mcpxPackage/app: mcpx (pkgs/ or apps/ in this repo)effort/sSmall: expected under 2 hours of workkind/enhancementpriority/normalOrdinary priority (the default)source/design-architectFiled by the repo design architect jobstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions