Repository navigation
Open
Labels
area/infraInfrastructure, deployment, and operationsInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workMedium: expected under 1 day of workkind/choreRoutine maintenance, housekeeping, dependency hygieneRoutine maintenance, housekeeping, dependency hygienemeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesNeeds physical hands on site: build, install, cable, or configure devicespriority/normalOrdinary priority (the default)Ordinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)Queue task is parked (waiting on CI, time, or an event)source/humanFiled directly by a humanFiled directly by a humanstatus/parkedDeliberately paused with a recorded resume conditionDeliberately paused with a recorded resume conditiontask/triageQueue packet kind: verify, reproduce, and route this itemQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle stateQueue worker lifecycle state
Description
Parent: #6066 (home lab build-out).
Drew's item (2026-11-04): rack 3 or 4 Dell switches — this is switch 2 of 3 filed (a 4th gets filed identically if it exists; see #6066).
Steps (Drew's per-switch list):
- (a) Build the rails and mount the rails; rack the switch
- (b) Update the firmware; record the firmware version on this ticket
- (c) Ensure everything works (hardware verification: ports/links, fans, management interface alive)
- (d) Build and deploy the initial config
- (e) Ensure the config is stored: switch configs live in the code repo (fleet principle: configs live in code). If no lab switch-config home exists yet, this ticket establishes one (suggested:
lab/switches/<hostname>/in developing-today/code) and records the final path here. Done = the running config is committed there and linked from this ticket - (f) Attach appropriate labels to the physical device with the label maker (hostname + role + management address)
Record on this ticket: switch model, hostname, management address, firmware version, stored-config link.
Acceptance criteria
- Switch racked: rails built and mounted, switch installed.
- Firmware updated; the firmware version recorded on this issue.
- Hardware verified: ports/links, fans, management interface alive.
- Initial config built and deployed; the running config committed to the repo's switch-config home and linked from this issue.
- Physical device labelled (hostname + role + management address); model, hostname, and management address recorded here.
Metadata
Metadata
Assignees
Labels
area/infraInfrastructure, deployment, and operationsInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workMedium: expected under 1 day of workkind/choreRoutine maintenance, housekeeping, dependency hygieneRoutine maintenance, housekeeping, dependency hygienemeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicesNeeds physical hands on site: build, install, cable, or configure devicespriority/normalOrdinary priority (the default)Ordinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)Queue task is parked (waiting on CI, time, or an event)source/humanFiled directly by a humanFiled directly by a humanstatus/parkedDeliberately paused with a recorded resume conditionDeliberately paused with a recorded resume conditiontask/triageQueue packet kind: verify, reproduce, and route this itemQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle stateQueue worker lifecycle state
Activity
developing-today commentedon Nov 5, 2026
CODE-1737
dezren39 commentedon Nov 5, 2026
Intake review
lab/switches/<hostname>/— the first switch to reach step (e) establishes it; the siblings then reuse it).73 remaining items
dezren39 commentedon Nov 5, 2026
🤖 Agent note · handed off
dezren39 commentedon Nov 5, 2026
🤖 Agent note · handed off
dezren39 commentedon Nov 6, 2026
🤖 Agent note · handed off