orchestration-pass (hourly, 43M input per 15h, the largest job body in the fleet at 26KB) has been mostly absorbed: producers create, the dispatcher assigns, lanes self-claim, the fleet monitor reconciles, stewardship-cycle reviews and dispatches, program-tending runs the daily roadmap pass.

Assess what remains uniquely its own — cross-queue priority calls, stuck-work escalation, goal-measurement rollup — and fold that residue into the Tend role: operational residue to stewardship-cycle, macro/alignment residue to program-tending (which owns Tend's look-back: completed + queued work vs projects, roadmaps, priorities). Then retire the hourly orchestration-pass. Done when the residue has named owners, the pass is disabled, and two check-ins show no triage gap.

Activity

  1. developing-today commented on Oct 29, 2026

    @developing-today
    Contributor
  2. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    TOP PRIORITY (Drew, 2026-10-29 01:23 CDT): Batch 3 fleet consolidation — pick this up in the next runs, ahead of routine work. Being enqueued to repo-health-code-pilot at top priority now.

  3. added
    queue/queuedHas a queued task in the Supabase agent queue
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Oct 29, 2026
  4. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · picked up

  5. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · done

    Triage verdict — premise CONFIRMED, residue owned, retirement gated

    Premise check (live state, 2026-10-29): orchestration-pass is enabled hourly. Its own recent output confirms the absorption claim: the 2026-10-29 runs recorded in sweep.log show 18 needsDrew carried, 15 needsOrchestrator carried, 0 answers / 0 dispatches, plus the project reconcile — i.e. what the hourly pass actually produces today is the residue named in this issue, because producers create, the dispatcher/conductor path assigns, lanes self-claim, the monitor reconciles queues, stewardship-cycle reviews/dispatches, and program-tending runs the daily roadmap pass. No premise corrections needed.

    Residue → named Tend owners

    Residue duty Owner Notes
    Cross-queue priority calls stewardship-cycle (operational Tend) It already reviews and dispatches hourly; priority arbitration across the four pilot queues joins that duty.
    Stuck-work escalation stewardship-cycle (decision owner) Detectors unchanged: fleet-watchdog alerts, repo-fleet-monitor's in-progress tracker escalates per protocol §6.3. Stewardship-cycle is the named owner that acts — including carrying the needsDrew / needsOrchestrator lists the pass carries today, so those lists survive retirement verbatim.
    Goal-measurement rollup program-tending (macro Tend) Joins its daily roadmap/epic pass and the #2131 macro look-back.
    Project reconcile (observed in live output; not named in the issue, recorded here so it is not orphaned) program-tending Access gate: program-tending's 2026-10-28 run reported the Projects board unreadable (gh token lacks read:project), while orchestration-pass reconciles successfully. The reconcile moves only after program-tending is verified to execute it through a working access path; until then retirement waits.

    Retirement plan (gated, reversible)

    1. Amend both receiving job bodies with the duties above; verify the reconcile access gate.
    2. One evidenced run of each receiving job carrying its residue.
    3. Then disable orchestration-pass (disable, never delete — rollback is re-enabling) and update the fleet-watchdog roster in the same pass.
    4. Two following daily token check-ins show no triage gap (carry lists still produced, reconcile still applied, nothing in the map unowned) — reported back here. That is this issue's own "done" test, and it belongs to the implementation, not to a hopeful same-day claim.

    Routing

    Implementation filed as #2155 (the five-step gated sequence with acceptance criteria) and enqueued as queue task 3175, flagged live-fleet-change. Role note: both receiving jobs are Tend in the #2131 map; orchestration-pass's Tend entry is removed at retirement, not before.

  6. dezren39 commented on Nov 1, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triage finding for step 5 (from #2155 re-triage, queue task 5550, Lane D)

    Interim step-5 input for task 4653: the retirement of orchestration-pass (step 4, 2026-10-31) was rolled back by Drew at ~00:44 CDT 2026-11-01 — the pass is enabled, running hourly, and reconciling the Project again, which makes it a second Project writer alongside program-tending (made sole writer in step 2). Task 4653's gap watch should judge that dual-writer state and the rollback, not a post-retirement gap. Full verdict with evidence is on #2155.

  7. 2 remaining items

  8. added
    source/creatorFiled by the new-issue-creator job
    task/triageQueue packet kind: verify, reproduce, and route this item
    on Nov 3, 2026
  9. developing-today commented on Nov 3, 2026

    @developing-today
    Contributor

    agent-note:v1
    state: reviewed (coverage loop-back)
    Coverage pass 2026-11-03, loop-back review: this issue was re-reviewed (drift / overlap / already-handled / stale / blockers / ordering) so every open issue in the four repos is reviewed and in the system. Verdict: still live; in the system as task 7300 (triage, queued, priority 50) in repo-health-code-pilot. Labels audited and synced. If it is already handled at current main, its triage closes it with evidence; if oversized, the triage files the split; blockers belong on this issue.
    Found via: coverage loop-back 2026-11-03

  10. added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Nov 4, 2026
  11. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  12. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: picked_up
    task: 7300 (repo-health-code-pilot; worker repo-worker-code; OpenChamber scheduled lane c29174f1-48e0-4b13-b4ff-9b73ab67e9ab)
    state: claimed; first checkpoint records origin=openchamber-scheduled-lane.
    verified: #2136 remains OPEN; no linked PR. Prior triage #3166 assigned the residue to stewardship-cycle/program-tending and routed implementation to #2155, but later check-ins recorded a rollback and a triage gap.
    next: verify current main and the latest #2155/#4653 follow-up before deciding whether the fold/retirement is now complete or still blocked; no live job changes.

  13. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: triaged
    task: 7300 (repo-health-code-pilot; worker repo-worker-code; OpenChamber scheduled lane c29174f1-48e0-4b13-b4ff-9b73ab67e9ab)
    state: still live; the absorption premise is not a completed retirement. Keep #2136 open; no new implementation packet was created because #2155 is the canonical blocked remainder.

    Fresh evidence (2026-11-04, current main 12fcad9722a3a52b67cb7d8d9a48ba888c371e83): doc/fleet-schedule-registry.md:144 still lists orchestration-pass as enabled hourly; program-tending and stewardship-cycle are also enabled. The #2155 implementation note says steps 1–4 had completed on Oct 31, but Drew re-enabled the hourly pass on Nov 1 (#2155 comment 6558353504). Its status remains OPEN / status/blocked. The two recorded check-ins (#2155 comment 6581369372) show stewardship carrying the residue, but program-tending's project reconcile remained dry-run/0 writes while orchestration-pass supplied the source and applied reconciliation. Thus the retirement and post-retirement no-gap acceptance are not met; the current dual-writer/access gate remains the blocker.

    Route: continue the existing #2155 / step-5 trail and resolve the project access/ownership decision there before any further retirement. #2055 remains the umbrella epic. No live schedules were changed; no source files changed. The task worktree was clean and only used to inspect current main.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

priority/highImportant and time-sensitivesource/creatorFiled by the new-issue-creator jobtask/triageQueue packet kind: verify, reproduce, and route this item