epic(cluster): network fabric #1084

Open

Description

@dezren39

Network fabric

Purpose

A documented, declarative network design sized for the cluster: fast east-west between nodes, scarce egress managed deliberately.

Scope

Switching and addressing plan replacing the torn-down v1.9 test layout (doc/talos-addresses.md is historical only). Confirm the exact high-speed NIC spec on core machines and the switch gear between them (needed to sanity-check LINSTOR/DRBD replication traffic). Management network for BMC/KVM. Edge: 2 Gbps symmetric Brightspeed fiber; egress strategy (tunnels to Cloudflare/Turso/Tailscale, compression) documented as design constraints. Existing notes: doc/network-topology.md, doc/inventory/routing-and-switching.md.

Execution mode

Hybrid: design and config online; cabling, switch install, and link verification physical.

Dependencies

Depends on epic 1 (NIC inventory). Gates epic 6 bootstrap.

Acceptance

Addressing + VLAN/segmentation plan committed; NIC/switch facts verified against hardware; management network reachable for every first-node machine.

Structure

Part of the basement cluster program. Project home: planning/roadmaps/basement-cluster.md in this repo. Full program register: goal workspace files/idea-register-2026-10-20.md (Muse goal goal_ba17a5777c21). Detailed task issues are filed as sub-issues of this epic; dependencies use blocks / blocked-by links.

Hard rules for the whole program: no HashiCorp anything; everything bootstrappable from config, no hand-built state.

Activity

  1. added
    area/infraInfrastructure, deployment, and operations
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    mode/hybridOnline work plus a physical step (power, cabling, KVM access to a real device)
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Oct 27, 2026

    @dezren39
    MemberAuthor

    Epic map — basement cluster program

    # Epic Issue
    1 Hardware inventory & first-node selection #1080
    2 Firmware / BIOS / BMC audit #1081
    3 Basement power & space #1083
    4 Network fabric #1084
    5 Storage assembly & validation #1085
    6 TALM + Talos bootstrap #1086
    7 Cozystack platform #1087
    8 Platform services #1088
    9 Observability, backup & recovery #1090
    10 Cloud extension (OCI & egress) #1091
    11 First workload: ID app #1092
    12 ESP32 wing #1093

    This epic: #1084 — Network fabric
    Dependencies: Blocked by #1080 (NIC facts); gates #1086

    Filed in the 2026-10-26 cluster seed. Project home: planning/roadmaps/basement-cluster.md.

  4. dezren39 commented on Nov 3, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: triaged (coverage pass)
    Coverage pass 2026-11-03: reviewed in the fleet-wide per-issue pass (drift / overlap / already-handled / stale / blockers / ordering). Verdict: still live; queued in repo-health-code-pilot as triage at priority 30 (priority/none). If this is already handled at current main, the triage closes it with evidence; if it needs splitting, the triage files the split.
    Found via: coverage pass 2026-11-03

  5. dezren39 commented on Nov 3, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triaged (epic live; one acceptance half is gated, the design half is not)

    • Agent: queue worker (repo-worker-code), OpenChamber scheduled lane ec118cad
    • Session / ID: queue task 7644
    • Fresh state at origin/main: epic(cluster): network fabric #1084 OPEN, no sub-issues (subIssuesSummary: 0/0), roadmap row planning/roadmaps/basement-cluster.md:21 lists it as planned. Source docs are on main: doc/network-topology.md, doc/inventory/routing-and-switching.md, doc/talos-addresses.md (historical only, as the issue says).

    Dependency, named: #1097 task(cluster): verify NIC and switch-gear facts is OPEN. That gates the hardware-verification half of the acceptance criterion ("NIC/switch facts verified against hardware"); it does not gate the design deliverables — the issue's hybrid execution mode says design/config are online while cabling, switch install and link verification are physical.

    Scope worth splitting (the epic has no children yet):

    1. Addressing + VLAN/segmentation plan — the committed-plan deliverable; can start now from doc/network-topology.md + doc/inventory/routing-and-switching.md.
    2. Management network (BMC/KVM) reachability — "reachable for every first-node machine"; depends on task(cluster): verify NIC and switch-gear facts #1097's verified inventory.
    3. Egress strategy as design constraints — 2 Gbps symmetric Brightspeed edge; tunnels (Cloudflare/Turso/Tailscale) and compression documented as constraints, not implementation.
    4. Physical verification — cabling, switch install, link checks; gated on task(cluster): verify NIC and switch-gear facts #1097 and on hardware in hand.

    Verdict: keep open as the epic tracker; no fix packet is appropriate while the hardware facts are unverified. When it is scheduled, items 1 and 3 are safely workable now; items 2 and 4 start after #1097. No production code is involved. No labels were in-flight, so none were changed beyond the triage state.

  6. added
    queue/queuedHas a queued task in the Supabase agent queue
    source/creatorFiled by the new-issue-creator job
    task/triageQueue packet kind: verify, reproduce, and route this item
    and removed on Nov 3, 2026
  7. dezren39 commented on Nov 3, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    state: triaged (coverage pass)
    Coverage pass 2026-11-03: reviewed in the fleet-wide per-issue pass (drift / overlap / already-handled / stale / blockers / ordering). Verdict: still live; queued in repo-health-code-pilot as triage at priority 30 (priority/none). If this is already handled at current main, the triage closes it with evidence; if it needs splitting, the triage files the split.
    Found via: coverage pass 2026-11-03

  8. added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Nov 4, 2026
  9. dezren39 commented on Nov 4, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · triaged

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area/infraInfrastructure, deployment, and operationseffort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)meta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/hybridOnline work plus a physical step (power, cabling, KVM access to a real device)source/creatorFiled by the new-issue-creator jobtask/triageQueue packet kind: verify, reproduce, and route this item