Basement power & space
Purpose
Power and physical space stop being the blocker for running the fleet.
Scope
Dedicated 20A circuits, each on its own breaker, from the panel across the unfinished basement to the server room (separate tracked goal: basement electrician). Basement cleanup and a rack/layout plan for the first 3-5 machines first, the full ~12 as the long tail. UPS strategy recorded.
Execution mode
Physical: electrician work and cleanup are hands-on and Drew-owned; agents prepare specs, get quotes, and track scheduling online.
Dependencies
Gates running more than a couple of machines at once; epics 5 and 6 need at least the first-node power in place.
Acceptance
Electrician engaged with the circuit spec; first circuits installed and verified; a layout plan for the first 3-5 machines exists and the space for them is clear.
Structure
Part of the basement cluster program. Project home: planning/roadmaps/basement-cluster.md in this repo. Full program register: goal workspace files/idea-register-2026-10-20.md (Muse goal goal_ba17a5777c21). Detailed task issues are filed as sub-issues of this epic; dependencies use blocks / blocked-by links.
Hard rules for the whole program: no HashiCorp anything; everything bootstrappable from config, no hand-built state.
Activity
developing-today commentedon Oct 27, 2026
CODE-224
dezren39 commentedon Oct 27, 2026
Epic map — basement cluster program
This epic: #1083 — Basement power & space
Dependencies: Gates fleet power; feeds #1085, #1086
Filed in the 2026-10-26 cluster seed. Project home:
planning/roadmaps/basement-cluster.md.docs(basement-cluster): link filed epic issues in roadmap
dezren39 commentedon Nov 3, 2026
Program tending — epic status (2026-11-03, via #1352)
This epic has had no activity in 7+ days: the epic and its open sub-issues were last touched 2026-10-27, while its sibling cluster epics all received fleet activity today.
Status recorded so the stall is visible, not silent. No closure proposed — acceptance is unmet.